Mitsubishi FX2N-8ER | Industrial Automation Component

SKU: FX2N-8ER
Regular price $16.87
Regular price -13% $19.40 Sale price $16.87
In stock
Usually ships within 24 hours
Condition
Factory pre-tested, ready for instant commissioning!

All industrial automation equipment comes complete with standard matching accessories and detailed step-by-step commissioning manuals. Unbox, install and commission your automation projects smoothly with full confidence.

Free shipping
100% secure payments
Industry leading quality

Ask an expert!

Mitsubishi FX2N-8ER

MELSEC-F Series FX2N-8ER

Specifications

Applicable PLC FX1N, FX3G, FX2N, FX3U, FX1NC, FX3GC, FX2NC, FX3UC [Connecting to the connector-type PLC] The FX2NC-CNV-IF is required to connect the FX1NC, FX2NC. The FX2NC-CNV-IF or FX3UC-1PS-5V is required to connect the FX3GC, FX3UC.
Mass (weight) 0.2 kg
Power supply specifications   / PLC internal power
Rated voltage   / 4 points
Input specifications Vertical terminal block (M3 screws)
No. of input points Sink
Input connection type No-voltage contact input NPN/Open collector transistor
Input type 24 V DC±10%
Input signal form 5 mA/24 V DC
Input signal voltage 4.3 kΩ
Input signal current 3.5 mA or more
Input impedance 1.5 mA or less
ON input sensitivity current Approx. 10 ms
OFF input sensitivity current Photocoupler insulation
Input response time LED on panel lights when input.
Indication of input operation   / 4 points
Input circuit configuration Vertical terminal block (M3 screws)
Output specifications Relay
No. of output points 30 V DC or less 240 V AC or less
Output connection type 2 A/point The total load current of resistance loads per common terminal should be the following value. 4 output points/common terminal: 8 A or less
Output type 80 VA
External power supply 5 V DC, 2 mA (reference value)
Max. load - Resistance load Approx. 10 ms
Max. load - Inductive load Approx. 10 ms
Min. load Mechanical insulation
Response time - OFF→ON When power is applied to relay coil, LED on panel is lit.
Ambient temperature 0 to 55°C when operating and -25 to 75°C when stored
Ambient humidity 5 to 95%RH (no condensation) when operating
Vibration resistance - Installed on DIN rail - Frequency: 10 to 57 Hz Half amplitude: 0.035mmnSweep Count for X, Y, Z: 10 times (80 min in each direction) The criterion is shown in IEC61131-2.
Vibration resistance - Installed on DIN rail - Frequency: 57 to 150 Hz Acceleration: 4.9 m/s 2 Sweep Count for X, Y, Z: 10 times (80 min in each direction) The criterion is shown in IEC61131-2.
Vibration resistance - Direct installing - Frequency: 10 to 57 Hz Half amplitude: 0.075 mm Sweep Count for X, Y, Z: 10 times (80 min in each direction) The criterion is shown in IEC61131-2.
Vibration resistance - Direct installing - Frequency: 57 to 150 Hz Acceleration: 9.8 m/s 2 Sweep Count for X, Y, Z: 10 times (80 min in each direction) The criterion is shown in IEC61131-2.
Shock resistance 147 m/s 2 Acceleration, Action time: 11 ms, 3 times by half-sine pulse in each direction X, Y, and Z The criterion is shown in IEC61131-2.
Noise resistance By noise simulator at noise voltage of 1,000 Vp-p, noise width of 1 μs, rise time of 1 ns and period of 30 to 100 Hz
Dielectric withstand voltage Between input terminal (24 V DC) and ground terminal: 500 V AC for 1 min Between output terminal (relay) and ground terminal: 1500 V AC for 1 min
Insulation resistance Between each terminals and ground terminal: 5 MΩ or higher by 500 V DC insulation resistance tester
Working atmosphere Free from corrosive or flammable gas and excessive conductive dusts
Working altitude 2000 m or less Do not use the PLC under pressure higher than the atmospheric pressure. Doing so may damage the PLC.

Description

FX1N, FX3G, FX2N, FX3U, FX1NC, FX3GC, FX2NC, FX3UC [Connecting to the connector-type PLC] The FX2NC-CNV-IF is required to connect the FX1NC, FX2NC. The FX2NC-CNV-IF or FX3UC-1PS-5V is required to conn

Place your order before 14:00 for earliest possible shipment handover. With round-the-clock transit operated by our partnered global logistics providers, parcels reach most international destinations following routine customs processing. Normal delivery takes 2–6 business days subject to customs clearance progress.Shipping fees will be charged for all orders under USD 500, and the exact shipping cost will be determined and collected by our logistics carriers. Shipments to remote international regions will incur additional courier surcharges to offset extra cross-border transportation costs.

Factory warranty service is not applicable to this industrial control equipment, and extended warranty packages are not provided for this item.

5.0 / 5 (3 reviews)