ABB

ABB 1SL0269A00

SKU: 1SL0269A00
Regular price $4,749.81
In stock
Usually ships within 72 hours
Condition
Factory pre-tested, ready for instant commissioning!

All industrial automation equipment comes complete with standard matching accessories and detailed step-by-step commissioning manuals. Unbox, install and commission your automation projects smoothly with full confidence.

Free shipping
100% secure payments
Industry leading quality

MIV100A100

The MIV100A100 (1SL0269A00) is an insulating base plate / mounting kit from the ABB Gemini range of insulating enclosures and switchboards, catalogued as INSULATING BASE PLATE 100A100 for the Gemini size 1 enclosure family. It provides the internal insulating mounting plate used to install DIN rail, cable duct and devices inside Gemini boxes and switchboards.

Gemini insulating base plates are purpose-matched to the enclosure size and are packed as kits (this item ships with packing note "1 SL0269 A00"), allowing the inside of the Gemini distribution enclosure to be fitted with an insulated, regulation-compliant mounting surface for electrical gear.

Technical Specifications

Product ID 1SL0269A00
Catalog Name MIV100A100
Series Gemini (insulating enclosures)
Accessory Type Insulating base plate / mounting kit
For Use With Gemini boxes and switchboards, size 1
Classification INSULATING BASE PLATE 100A100
Ordering Packing: 1 SL0269 A00

Shipping & Warranty

This unit is shipped as New Surplus — unused, original-condition industrial automation equipment. It is backed by a 12-month limited warranty provided by our company for your risk-free purchase. Please verify part number and technical compatibility before ordering; our technical support team is available to confirm selection. Worldwide export packaging is available and orders are dispatched promptly with reliable logistics and tracking.

Place your order before 14:00 for earliest possible shipment handover. With round-the-clock transit operated by our partnered global logistics providers, parcels reach most international destinations following routine customs processing. Economy shipping takes 9–14 business days, while express delivery arrives in 5–8 business days, both subject to customs clearance progress.Shipping fees will be charged for all orders under USD 500, and the exact shipping cost will be determined and collected by our logistics carriers. Shipments to remote international regions will incur additional courier surcharges to offset extra cross-border transportation costs.

Factory warranty service is not applicable to this industrial control equipment, and extended warranty packages are not provided for this item.

★★★★★

No reviews yet. Be the first to review this product!